Gate shaft is 200 feet down to the bottom. One pipe runs 1200 feet to the reservoir and the other 1000 feet to the creek. Shaft was blasted and a boring machine was used to bore the holes. The shaft walls are being reinforced with rebar and poured concrete. 21 years as a Concrete Pump Operator and that was a first for me. Just thought it was cool.