I'm about to start a load workup for a Mausingfield M7 action.
My standard procedure is to start low and move higher watching for signs of pressure and load below that maximum.
Will this work with the Mausingfield bolt head and ejector design?
No ejector marks to look for obviously and I'm wondering if the bolt head design might make stiff bolt lift not a good pressure sign.
My standard procedure is to start low and move higher watching for signs of pressure and load below that maximum.
Will this work with the Mausingfield bolt head and ejector design?
No ejector marks to look for obviously and I'm wondering if the bolt head design might make stiff bolt lift not a good pressure sign.