I wanted to post some details about a load I'm working up and get additional eyes for safety. Based on the load data the max charge is 49.7g (155HPBT). Following the OCW method, I took 10% off the top to begin my load:
42.5 (min charge)
45.0
45.3
45.6
45.9
46.2
46.5
46.8
47.2
47.5
47.8
Should I continue load development to near max or stop? I have a chronograph so I will be able to gauge MV. Thanks all for your help and guidance!
42.5 (min charge)
45.0
45.3
45.6
45.9
46.2
46.5
46.8
47.2
47.5
47.8
Should I continue load development to near max or stop? I have a chronograph so I will be able to gauge MV. Thanks all for your help and guidance!