Possibly. You will want to confirm the torque specs for the ACC with MDT, even with the Deadline inlet. I think they may still recommend a lower torque spec and the inletting makes it drop in ready.
Not to distract anyone, but our Deadline specific ACC allows you to run them at full torque (65 in-lbs) We had issues with the UP Deadline in the 90 degree v-block and R700 inlet, so we made some *tweaks*!
Josh