Ken,
Can you build a switch barrel .308/7WSM with the Deviant like you can with the Surgeon?
Sure, would require 2 bolts and ideally you'd select a detachable magazine system like the Badger M5.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Ken,
Can you build a switch barrel .308/7WSM with the Deviant like you can with the Surgeon?
Any timing updates on GAP-10 orders? Just trying to estimate/budget for my actual finish time, ordered in February with Green magpul furniture.
Are you referring to rifle length or mid length hand guards, or both? Also, what's a wedge block? Thanks for the heads up on the additional wait time.
Thanks for the update George.
I ordered my GAP10 on the second of Feb. Is there any way to insure that I get the newer handguard? If a slightly longer wait time is needed thats fine with me.
Clay
Thanks for the update George.
I ordered my GAP10 on the second of Feb. Is there any way to insure that I get the newer handguard? If a slightly longer wait time is needed thats fine with me.
Clay
Ken,
Can you build a switch barrel .308/7WSM with the Deviant like you can with the Surgeon?
I ordered my hospitaller from ken on the 10th. He still said 6 month lead time. I would have to wait 15 months if I wanted surgeon action. So I went with the templer. Hope to order another build by Christmas.
I'm not really in a rush so don't want to press this issue really, but anxious nonetheless, which makes me curious if a surgeon action rifle in 260 ordered in late December 2012 will still be around the 12 month estimate or if the order volume and surgeon delays have pushed it out to something longer like 15 months as seen in someone else's post above. Thanks
Snatched a .260 in a Rock Solid stock off of there last week for my second GAP. I'm enjoying shifting back to bolt guns from too many years on the semis.ok if you guys haven't seen GAP has a TON of rifles ready to ship right now
Rifles Ready to Ship
get em while they are hot.
ok if you guys haven't seen GAP has a TON of rifles ready to ship right now
Rifles Ready to Ship
get em while they are hot.
oh your just breaking the iceberg bro, GAP's are like pringles, once you start you can't stop
(Note from George Gardner 8-14-13 "Guys in Maryland and Connecticut were shoved forward due to Legislation that was passed and deadlines that came with those laws that passed so a few rifles were jumped to the front to ensure those guys did not get screwed by their states . Everyone else. We are finishing up December orders this week and January Orders start delivering next week. January will take 2 months to get through. February will take a month to a month and a half. If you ordered your rifle in March-April you're looking at a December delivery at the moment. This is an educated guess, we have lots of parts now, so further delays don't look like an issue. We are absolutely doing these as fast as possible but were not going to sacrifice quality for speed!! Once we get through this year the builds should go back to exactly what was quoted. and hopefully by Jan 2014 we will be quoting 2-3 months again").
whats the price for a barreled action? (Templar v2, 20in 308 barrel with mtu contour 1:10 twist)
Any idea of turnaround time to re-hab a GAP-10? What I need is...
Re-barrel, 20" Fluted Bartlien w/Coyote cerakote
Upgrade to adj. gas block
Replace anything else on the upper than may be toast
whats the price for a barreled action? with parts not provided and whats the cost with parts provided?
Thanks Ken. I did get your message. Been slammed the last few days. Will e-mail you this weekend.Current turn around time for rebarrel on GAP 10 is estimated at 3-6 months. (lead time very much dependent upon availability of parts--if we are waiting on vendors for full builds, a smith may be able to hop on your rebarrel and get you squared away even faster).
Give me a shout via Email if you have any questions. I'll be able to send you our shipping form and get the specs punched out for you. [email protected]
GAP 10: 10 months
(Note from George Gardner 8-14-13 "Guys in Maryland and Connecticut were shoved forward due to Legislation that was passed and deadlines that came with those laws that passed so a few rifles were jumped to the front to ensure those guys did not get screwed by their states . Everyone else. We are finishing up December orders this week and January Orders start delivering next week. January will take 2 months to get through. February will take a month to a month and a half. If you ordered your rifle in March-April you're looking at a December delivery at the moment. This is an educated guess, we have lots of parts now, so further delays don't look like an issue. We are absolutely doing these as fast as possible but were not going to sacrifice quality for speed!! Once we get through this year the builds should go back to exactly what was quoted. and hopefully by Jan 2014 we will be quoting 2-3 months again").
Is there an update on December order completion/delivery dates? From the message above, it sounded like they were going to be completed by August 16th.
Hi Aflick, There's quite a few GAP 10 orders that are being held for lack of surefire 762ssal/re muzzle brakes. If you did not specify that device, send me an email with your first and last name---I'll be happy to check it out for you.
[email protected]