I've got the bug to build a big blaster, say 300NM. I really want to do it on an ARC CDG but the lead times worry me since I will need a LA, LH, with a LM BF. I'm watching the CDG thread and talking to ARC from time to time but all I hear is ~4 months. That's pretty great these days if that's really what it is. Has anyone seen anything besides the RHSAs in the wild? If I know they're actually shipping, and the lead is really 4 months (or even +6 months), it's game on