Since most of my images in the earlier posts disappeared.... here are some 'memories' of how this looked like when it started!
Starting in late January with barn attic place full of crap. Uninsulated.
Framing in a couple of curtain walls by early Feb.
[IMG2=JSON]{"alt":"null","data-align":"none","data-size":"full","src":"https:\/\/www.snipershide.com\/shooting\/filedata\/fetch?photoid=6683170"}[/IMG2]
More walls, furring, window frames, etc.
Putting in the ceilings (used outdoor tin, pre-painted) as my ceilings. Worked out fantastic. Great industrial loo, no sheetrocking, no taping No dust. Note the pocket door.
All insulated.
Here is the reloading side, white ceiling. Insulation all up. furred out the original 2 x 4's to 2 x 6 to get a really good level of insulation in.
Number 2 pine barnboard on all the walls. Looks great and smells fantastic. Left it unfinished. It will mellow into a golden brown over time.
All the windows framed and starting to put them in during early May. Need to finish the floor in this side. Bamboo from Lumber Liquidators. Nice stuff!
Last window about to go in (frame built, just have to cut out exterior wall.
From here it was just a couple of weekends to build all the shelves and benches. And another weekend (Memorial Day weekend) to move all the reloading stuff in and bolt it all in place.
One of the best investments was a whole pile of Acro bins. Bought cheap off eBay. You can't have enough of them! Bought a bunch of different sizes and they are just fantastic!
I'll post some pictures next weekend now that it is 'in use.' Including some of the more interesting little tools I use.
Cheers,
Sirhr