Well I just got a phone call from Tracy at GAP today, and my Hospitaller in .308 is completed, and ready to ship. The lead time was 14 weeks from the day that I sent the check. I think that I was quoted 4-6 months, so that is not to bad at all. I received my scope from US Optics about 3 weeks or so ago, so I would have to guess that these two will be meeting each other next week sometime. I've also been sitting on my Atlas V8 for a while now, so I'm really ready to make this happen. I will post pics when I'm ready to go.