I am in the process of installing a gas block from palidan machine. Per the instructions I cut 7/8" of the end of my gas tube. Now the new block holds the tube with two set scews.
Here is my dumb question. I think the tube should be all the way into the gas key but I am not 100% sure.
Can someone please tell if the gas tube should be all the way inside the gas key to the point that its touching?
Here is my dumb question. I think the tube should be all the way into the gas key but I am not 100% sure.
Can someone please tell if the gas tube should be all the way inside the gas key to the point that its touching?