Receiver machine work to start. Altering the ejection port geometry so long stuff will punt out of the receiver.
Once were good there, I run it through the alignment ritual again just to be sure.
ID bored and threadmilled base hole.
Feedramp resurfacing:
Sweating the wedding band to the barrel:
Cleanup:
Now a one off base for this thing:
Gauging the Stenag rail geo after machining:
Creating the rail road ties:
Op1 complete. Onto the bottom side: (WIP)_
Once were good there, I run it through the alignment ritual again just to be sure.
ID bored and threadmilled base hole.

Feedramp resurfacing:

Sweating the wedding band to the barrel:

Cleanup:


Now a one off base for this thing:

Gauging the Stenag rail geo after machining:

Creating the rail road ties:

Op1 complete. Onto the bottom side: (WIP)_
